Project overview

Joseph Gallagher Ltd acted as a subcontractor on the Old Oak Common project, specializing in microtunneling works and the installation of launch and reception shafts critical to the diversion of existing utilities to facilitate permanent works. Their scope included the design, excavation, and construction of robust launch and reception shafts that facilitated the microtunneling process for utility ducts and services beneath the site. This involved precise shaft sinking in confined urban spaces, managing groundwater control, and installing temporary works to ensure safe and stable excavation.

In addition to shaft construction, Joseph Gallagher Ltd executed the microtunneling operations, using remote-controlled tunneling equipment to install underground pipelines with minimal surface disruption. Their work demanded close coordination with the main contractors and design teams to meet Network Rail and Crossrail technical standards, ensuring alignment with overall project interfaces. The successful delivery of these microtunneling elements was essential for the integration of critical utility services and structural foundations at Old Oak Common station.

Duties and responsibilities

As Sub Agent managing the microtunneling and shaft installation works for Joseph Gallagher Ltd at Old Oak Common, I was responsible for overseeing day-to-day site operations, coordinating between subcontractors, main contractors, and client representatives to ensure seamless progress. I managed the planning and scheduling of shaft excavations and microtunneling activities, ensuring all works were executed safely, on time, and in compliance with Network Rail and Crossrail standards. I supervised site logistics, materials delivery, and workforce deployment while maintaining strict quality control and safety protocols. Liaising closely with design engineers and temporary works coordinators, I helped resolve technical challenges and facilitated the smooth integration of microtunneling elements within the wider project scope. I also managed reporting, site documentation, and ensured all environmental and contractual requirements were met, supporting the successful delivery of this complex infrastructure component.

🗂 Planning & Coordination

  • Scheduling and coordinating microtunneling and shaft installation works

  • Liaising with main contractors, subcontractors, and client representatives

  • Managing site logistics and workforce deployment

⚙️ Technical & Quality Control

  • Overseeing compliance with Network Rail and Crossrail standards

  • Ensuring quality control throughout excavation and tunneling operations

  • Coordinating with design engineers and temporary works teams to resolve technical issues

🔒 Health, Safety & Environmental

  • Implementing and enforcing site safety protocols and risk assessments

  • Monitoring environmental controls and ensuring regulatory compliance

📋 Reporting & Documentation

  • Preparing daily progress reports and site records

  • Managing site documentation, including method statements and risk assessments

  • Supporting contractual and environmental compliance through accurate record-keeping

Contents

Role

Sub Agent

Team

Duration and date

12 Months

Apr 21 - Apr 22

Role

Sub Agent

Team

Duration and date

12 Months

Apr 21 - Apr 22

Role

Sub Agent

Team

Duration and date

12 Months

Apr 21 - Apr 22

Let's connect

I'm not just here to design products; I'm here to connect with people.

As a product designer, I'm on an exciting journey to blend creativity with technology to craft memorable user

Phone Number

07375 241 879

07375 241 879

07375 241 879

Email

hussain@hussainabrar.co.uk

hussain@hussainabrar.co.uk

hussain@hussainabrar.co.uk

Current Residence

San Fransisco