Project Stats
Project overview
Joseph Gallagher Ltd acted as a subcontractor on the Old Oak Common project, specializing in microtunneling works and the installation of launch and reception shafts critical to the diversion of existing utilities to facilitate permanent works. Their scope included the design, excavation, and construction of robust launch and reception shafts that facilitated the microtunneling process for utility ducts and services beneath the site. This involved precise shaft sinking in confined urban spaces, managing groundwater control, and installing temporary works to ensure safe and stable excavation.
In addition to shaft construction, Joseph Gallagher Ltd executed the microtunneling operations, using remote-controlled tunneling equipment to install underground pipelines with minimal surface disruption. Their work demanded close coordination with the main contractors and design teams to meet Network Rail and Crossrail technical standards, ensuring alignment with overall project interfaces. The successful delivery of these microtunneling elements was essential for the integration of critical utility services and structural foundations at Old Oak Common station.
Duties and responsibilities
As Sub Agent managing the microtunneling and shaft installation works for Joseph Gallagher Ltd at Old Oak Common, I was responsible for overseeing day-to-day site operations, coordinating between subcontractors, main contractors, and client representatives to ensure seamless progress. I managed the planning and scheduling of shaft excavations and microtunneling activities, ensuring all works were executed safely, on time, and in compliance with Network Rail and Crossrail standards. I supervised site logistics, materials delivery, and workforce deployment while maintaining strict quality control and safety protocols. Liaising closely with design engineers and temporary works coordinators, I helped resolve technical challenges and facilitated the smooth integration of microtunneling elements within the wider project scope. I also managed reporting, site documentation, and ensured all environmental and contractual requirements were met, supporting the successful delivery of this complex infrastructure component.
🗂 Planning & Coordination
Scheduling and coordinating microtunneling and shaft installation works
Liaising with main contractors, subcontractors, and client representatives
Managing site logistics and workforce deployment
⚙️ Technical & Quality Control
Overseeing compliance with Network Rail and Crossrail standards
Ensuring quality control throughout excavation and tunneling operations
Coordinating with design engineers and temporary works teams to resolve technical issues
🔒 Health, Safety & Environmental
Implementing and enforcing site safety protocols and risk assessments
Monitoring environmental controls and ensuring regulatory compliance
📋 Reporting & Documentation
Preparing daily progress reports and site records
Managing site documentation, including method statements and risk assessments
Supporting contractual and environmental compliance through accurate record-keeping
Project Gallery
Employer
Joseph Gallagher Ltd (JGL)
Let's connect
I am planning Engineer with 10+ years' experience in heavy civil projects, skilled in first-principles forecasting, technical review, Earned Value Management, and delivering highly complex projects.
Phone Number
Current Residence
London, UK